Product images and videos are provided by our supplier partners and may not always be perfectly accurate. Not sure this fits? or call (760) 282-4645 and we’ll verify before you order.
Air and Fuel› Fuel Injection Systems and Components - Electronic
Full Force Diesel
Full Force Diesel 7.3 Powerstroke 1999-2003 7 AD and 1 AE Long Lead Legacy Injectors Stock Flow Set LEGADLLSET
SKU: F06O LEGADLLSET
Advanced — 4+ hours
Overview
Show original supplier description
Product descriptions are provided by our supplier partners and may not always be perfectly accurate. Not sure this fits? or call (760) 282-4645 and we’ll verify before you order.
Fitment
Fitment Guaranteed
Don’t gamble
on fit.
Log your build in the MOTORMIA app and we’ll guarantee this part fits your exact setup — or your money back, return shipping covered.
Available on iOS & Android
Specifications
| Brand | Full Force Diesel |
| Part Number | F06O LEGADLLSET |
Videos
7.3 Powerstroke Injectors Full Force Diesel- On Performance T.V.
FULL FORCE DIESEL INJECTOR INSTALL!! Stage 1 Build [EP.7]
FUEL FORCE DIESEL STAGE 1.5 180/30 INJECTOR INSTALL 7.3 POWRSTROKE 400HP UPGRADE
7.3 Powerstroke: Before and After FULL FORCE INJECTOR UPGRADE
Project 7.3 Gets New BIG 250cc 200% Full Force Diesel Injectors! (Install, Review, and Start Up)
7.3 Powerstroke Injector Upgrade Full Force Diesel 180cc injectors
Unboxing of a fresh set of 180/30 injectors from Full Force Diesel
2004 6.0 Powerstroke Diesel 10 -70 MPH. straight piped,190cc Full Force injectors.
We’re here — turning wrenches, just like you.
Call us, follow along, or come say hi.
Buy with Confidence
Returns & Fitment
Built for enthusiasts. Every order is backed by our 30 day return window on eligible items. Unused and uninstalled products may be returned with approved RMA and no restocking fees when received in new condition. Orders placed through the MOTORMIA app with a complete build qualify for our Fitment Guarantee — free return shipping if the part doesn’t fit your exact setup. The guarantee covers fit only; installation must follow manufacturer instructions, and we recommend a qualified shop for parts marked Difficulty 4–5.
View Full Return PolicyShipping
Orders are processed in 1–3 business days. In stock parts ship promptly from our partner network. Special-order items either aren’t currently stocked or are built to your spec — expect 4–6 weeks. If a part goes on backorder while your order is in the queue, we’ll reach out and work through discounted alternatives together.
View Full Shipping Policy